|
Streets

General
Information
The department's mission and responsibilities include:
-
Routine maintenance of all City streets and gutters
-
Finish ramps built by the Boardwalk Department
-
Manhole repair using hot or cold patch
-
Snow removal and salting of City streets
-
Installation of new frame and lids for catch basins
-
Replacing concrete base after depressions or cave-ins
caused by drainage failure
-
Installation of new granite inlets along with the
drains and boxes
-
Replace drain pipes from inlet drains to catch basins
-
Replace gutters for better drainage
-
Replace City owned concrete curbing, driveways, and
sidewalks
-
Installation of handicapped ramps at all intersection
of City streets
-
Maintain tree pits by resetting bricks
|